[141DB Monitoring quality of water potentially affected by discharges from storm overflows and sewage disposal works]

[141DB  Monitoring quality of water potentially affected by discharges from storm overflows and sewage disposal works]

[(1)     A sewerage undertaker whose area is wholly or mainly in England must continuously monitor the quality of water upstream and downstream of an asset within subsection (2) for the purpose of obtaining the information referred to in subsection (3).

(2)     The assets referred to in subsection (1) are—

(a)     a storm overflow of the sewerage undertaker, and

(b)     sewage disposal works

Powered by Lexis+®

Popular documents