143 Allocation of site preparation expenditure

143  Allocation of site preparation expenditure

(1)     The amount of site preparation expenditure allocated to a period of account for the purposes of section 142(2) is the amount given by the formula—

RE x (WD / (SV + WD))

·É³ó±ð°ù±ð—

RE means residual expenditure (see subsection (2)),

WD means the volume of waste materials deposited on the waste disposal site during the period, and

SV means the volume of

Powered by Lexis+®

Popular documents