[24AC Functions of risk advisory groups]

[24AC  Functions of risk advisory groups]

[(1)     The risk advisory group for an aerodrome must prepare a risk report for the aerodrome before the end of the period of 2 months beginning with the day by which the group is required to be established.

(2)     A risk report is a document containing an assessment of each threat to the security of the aerodrome.

(3)     In relation to each such threat,

Powered by Lexis+®

Popular documents